# Learn from your past to improve the future

**Reporting&#x20;**&#x68;elps you see how your production really worked, spot trends, and identify areas for improvement.&#x20;

By comparing real historical data to your past production plan, you can know how effective your past decision was, make smarter decisions and keep your operations running smoothly.&#x20;

## What Can You See in Reporting?

You’ll find all reports under the **Reports** section in the main menu. Depending on your licenses, you can access a range of reports like:



| Report                                | What It Shows                                                                                      |
| ------------------------------------- | -------------------------------------------------------------------------------------------------- |
| Process Feedback                      | Lists feedback for Processes.                                                                      |
| Work Step Feedback                    | Lists feedback for Work Steps.                                                                     |
| Material Demand (Detailed)            | Detailed list of materials needed for all Orders Items and Work Steps.                             |
| Material Demand (Grouped)             | Groups material needs by type.                                                                     |
| Disruptions / Machines                | Chart showing which disruption happened on which machine.                                          |
| Machines / Disruptions                | Chart showing which machine experienced which disruption.                                          |
| Planned vs. Actual Times (Processes)  | Compares planned times for Processes with actual times from feedback.                              |
| Planned vs. Actual Times (Work Steps) | Compares planned times for Work Steps with actual times from Feedback.                             |
| Capacity Utilization                  | Graph showing how busy Resources were versus their availability over time.                         |
| Overall Equipment Effectiveness (OEE) | Measures how effectively a resource was used, factoring in availability, performance, and quality. |
| Scrap Reasons / Machine               | Chart showing Scrap reasons linked to specific machines.                                           |
| Machine / Scrap Reasons               | Chart showing machines and the types of rejected Scrap they produced.                              |
| Daily Resource Availability           | Shows where Resources had overcapacity or undercapacity each day.                                  |
| Schedule Adherence                    | Measures how closely actual completion dates matched planned delivery dates.                       |
| Process Efficiency                    | Compares total run times of work steps against the entire Production Order duration.               |

## Organizing Your Reports

You can group your reports into **tabs** on the start page for easier access:

- Click the **plus (+)** icon.
- Enter a name for your new tab.
- Add the reports you want to keep handy

::Image[]{src="https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/mB84WXqg7F1SnGtu_wyP5_image.png" size="34" width="347" height="194" position="flex-start" darkWidth="347" darkHeight="194" showCaption="false"}

# Helpful Features in Reporting

planeus makes it simple to customize and work with your reports. Here’s what you can do:

## Change time units

- Click the **gear icon** to adjust how time units appear in your reports (minutes, hours, etc.).

::Image[]{src="https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/b1IwClvbC2RaBYxpEE75i_image.png" size="34" width="259" height="189" position="flex-start" darkWidth="259" darkHeight="189" showCaption="false"}

## Show sums

- Click the **sum icon** to display a row of totals above your report list.
- Totals reflect whatever data is visible after applying filters.

::Image[]{src="https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/etHQI4frbnVdIaowFBZjq_image.png" size="88" width="794" height="466" position="flex-start" darkWidth="794" darkHeight="466" showCaption="false"}

# Saveable Filters

![](https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/W7ro3PSx49MyU4z_8OPGL_image-2.png)

The filters are saved per user.

# Export your reports

- Click the **Export** button in the upper-right corner of any report.
- Export data as a **CSV file** or save charts as **PNG images**.

:::hint{type="success"}
**Pro tip:**
For the best results when exporting to Excel, make sure planeus, your operating system, and Excel itself **are set to the same language.&#x20;**
:::

# What kind of Reports are there?

Here’s how some important reports calculate their results:&#x20;

## Report: Daily Resource Availability&#x20;

Shows where your Resources have **too much or too little capacity&#x20;**&#x6F;n each day.

:::hint{type="warning"}
To use this report, you need to **first&#x20;**&#x65;nable it for the Resource under **Resource Master Data**.
You also need to set a **Capacity Factor** for accurate calculations.
:::

![](https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/rsPULvSsMnEKJN3sN2cQu_image.png)

**Calculation:**

```tex
\text{Available Capacity} = \bigl( \text{Available Min.} - \text{Scheduled Min.} \bigr) \times \text{Capacity Factor}

```

**Color Codes:**

- **Negative times&#x20;**&#x61;re shown in <font color="#ff0000">**red**</font>.
- **Values over 10 hours** are shown in <font color="#059c0f">**green**</font>.


**For example:**

- **Available capacity:&#x20;**&#x38; hours
- **Already scheduled:** 1 hour
- **Capacity factor:&#x20;**&#x34;

```tex
(8 - 1) \times 4 = 28
\quad \\\\ \text{Total Capacity} = 8 \times 4 = 32
```



Report: Schedule Adherence (Historical)&#x20;
---------------------------------------------

Helps track whether work was completed on time:

- **For Order Items:**
  &#x20;Measures the date an order was marked “Completed” against its planned delivery date.
  &#x20;→ If finished early, the deviation will be in 0.
- **For Work Steps:**
  &#x20;Measures the completion date against the planned end date.


Tolerance Settings

In [Administration → Settings → Reporting](docId\:MCScW6CEMmikvG-WSpxzV), you can define a time tolerance (in hours).

- Orders or Work Steps completed within this tolerance are marked **“On Time.”**
- The deviation value remains unchanged, but:
  - <font color="#22C55E">**Green** </font>= On time
  - <font color="#ff0000">**Red**</font> = Late

::Image[]{src="https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/aPcL171fYJiLGz_XjswHo_image.png" size="70" width="1642" height="574" position="flex-start" darkWidth="1642" darkHeight="574" showCaption="false"}



## Report: Process Efficiency (Historical)&#x20;

- Compares the **total run time of all work steps** with the total run time of the full production order.

## Report: Capacity Utilization (Historical)&#x20;

:::hint{type="warning"}
This report is based on the actual dat&#x61;**&#x20;collected from Workbench**.&#x20;
:::

In this Report, there are three options to measure utilization:

1. **24-Hour Basis (Default):**
   - Compares actual hours worked each day against 24 hours.
   - For weeks, total hours divided by (24 x 7).
2. **Available Capacities:**
   - Uses each resource’s defined shift plans.
3. **Absolute Hours:**
   - Shows raw hour totals instead of percentages.

**For example:**

| Date   | Hours Worked |
| ------ | ------------ |
| June 2 | 10 hours     |
| June 3 | 12 hours     |
| June 4 | 16 hours     |
| June 7 | 8 hours      |

Using the different calculation methods, here’s how the values compare:

| **Date**    | **Absolute Hours** | **% of 24 Hours** | **% of Available Capacity (Example Shifts)** |
| ----------- | ------------------ | ----------------- | -------------------------------------------- |
| Wed, June 2 | 10                 | 10/24 = 41%       | 10/12 = 83%                                  |
| Thu, June 3 | 12                 | 12/24 = 50%       | 12/12 = 100%                                 |
| Fri, June 4 | 16                 | 16/24 = 67%       | 16/10= 160%                                  |
| Mon, June 7 | 8                  | 8/24 = 33%        | 8/12 = 67%                                   |

**For June 2 (shift plan = 12 hours):**

- 10/24 = 41% utilization (24-hour method)
- 10/12 = 83% utilization (shift plan method)

|                 | Stunden absolut | 24 Stunden  | Verfügbare Kapazität\* |
| --------------- | --------------- | ----------- | ---------------------- |
| Mittwoch 2.6.   | 10              | 10/24 = 41% | 10/12 = 83%            |
| Donnerstag 3.6. | 12              | 12/24 = 50% | 12/12 = 100%           |
| Freitag 4.6.    | 16              | 16/24 = 67% | 16/10= 160%            |
| Montag 7.6.     | 8               | 8/24 = 33%  | 8/12 = 67%             |

The calculation for **Available Capacity&#x20;**&#x63;omes from the Resource’s pre-defined **Capacity Plan (shift plan)**. If a Resource has a 12-hour shift, that becomes the capacity baseline for percentage calculations.&#x20;

![](https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/ZmfKMpWAP7OTLDWOMjqhI_image.png)

The report shown i&#x6E;**&#x20;Chart form**: Available Capacities&#x20;

![](https://api.archbee.com/api/optimize/O6NV_up0P2Knz9FYPJJKG-CkZlutz6MhrjdNPXGHOhW-20250710-165858.png)

## Overall Equipment Effectiveness (OEE)



**OEE (Overall Equipment Effectiveness)** is a way to analyze **past performance** and see how efficiently your machines or resources were used. OEE is always based on past data.

**It’s calculated as:**

```tex
OEE = \text{Availability Factor}
 × \text{Effectiveness Factor}
 × \text{Quality Factor}

```

In the menu **[Administration / Settings / Reporting](docId\:MCScW6CEMmikvG-WSpxzV)**, you can configure various options for the calculation.

::Image[]{src="https://api.archbee.com/api/optimize/M1QBpK9lJudQQL_d-GMK2/BCLaBl2HmC0f23xtUnE3G_image.png" size="66" width="1100" height="488" position="flex-start" darkWidth="1100" darkHeight="488" showCaption="false"}

Overall Equipment Effectiveness (OEE)

### Availability Factor (Time Utilization)&#x20;

You can choose betwee&#x6E;**&#x20;two ways** to calculate available capacity:

**Option 1 — Gross Available ~~C~~apacity (24/7)**

- Assumes your resource is available **100% of the time**, 24 hours a day, 7 days a week.
- Does not subtract downtime like gaps, holidays, or planned maintenance.

**Option 2 — Net Available Capacity**

- Starts with the full 24 hours per day, then subtracts:
  - Downtime from capacity plans
  - Public holidays
  - Non-informative gaps (planned but minor downtimes)

```tex
\textbf{Availability Factor} 
=
\dfrac{
    \raisebox{5pt}{\text{Operating Time}}
}{
    \text{Available Capacity}\rule{0pt}{13pt}
}

```

Where:
**Operating Time** = Available Capacity (from Option 1 or 2) minus **Downtime from disruptions.**

### Performance Factor (Speed of Production)&#x20;

Tells you how efficiently your resource was running in terms of speed and output.&#x20;

**Calculation:**

```tex

\begin{array}{r l}
    & \text{Yield Time} \\
  + & \text{Setup Time} \\
  - & \text{Downtime from Disruptions} \\
  - & \text{Time spent on Scrap Production} \\ \hline
    & \text{Effective Time}\rule{0pt}{13pt}
\end{array}
```

Then:&#x20;

```tex
\textbf{Performance Factor} 
=
\dfrac{
    \raisebox{5pt}{\text{Effective Time}}
}{
    \text{Available Capacity}\rule{0pt}{13pt}
}


```

### Quality Factor (Quality of Products)

Shows what portion of your production was in good quality versus rejected scrap.&#x20;

**Calculation:&#x20;**

```tex
\text{Total Quantity} = \text{Yield Quantity} + \text{Scrap Quantity}
```

```tex
\textbf{Quality Factor} 
=
\dfrac{
    \raisebox{5pt}{\text{Yield Quantity}}
}{
    \text{Total Quantity}\rule{0pt}{13pt}
}

```

### Putting It All Together&#x20;

Hence, The final OEE score is calculated as:&#x20;

```tex
OEE = \textbf {Availability Factor} × \textbf{Performance Factor} × \textbf{Quality Factor}
```

A high OEE means your machines are running reliably, fast, and producing good-quality products.&#x20;

# Reporting Plugin

planeus also offers a **Reporting Plugin&#x20;**&#x74;hat lets you create custom reports tailored to your needs—without waiting for a new software release.&#x20;

:::hint{type="success"}
From simple lists of feedback to complex charts like OEE or capacity utilization, planeus Reporting helps you analyze past performance and **understand how your production really ran**.
:::



